Merit Award
John Deere Road (IL Route 5) Reconstruction and Widening
Owner: Illinois Department of Transportation
Phase II engineering services were required for the preparation of two sets of contract plans,
roadway plans, structure plans, specifications and estimates for roadway reconstruction and
widening improvements on IL 5 (John Deere Rd) from approximately west of 38th St. to 70th St.
in Moline. The proposed improvement consisted of widening the existing four-lane roadway to a six-lane facility, adding dual-left turn lanes, ramp modifications at I-74, eliminating access to 38th St. north of IL 5 and the construction of a connector road, adding a new bridge, pavement
reconstruction, shoulder improvements, frontage road modifications, drainage and utility investigation, culvert replacements and extensions, adding curb and gutter, preparing a drainage report to determine storm sewer sizes and inlet locations, retaining wall design, geometric, traffic signal and lighting improvements. The project consisted of two separate contract packages. One set of plans is designed from west of 38th St. to 53rd St. and the second set is from approximately 53rd St. to 70th St. This facility is partially access controlled.
Lin Engineering, Ltd. performed civil and structural design support for the project, including design of proposed sign structure trusses, culverts, retaining walls, signing and striping plans, and proposed erosion control plans.